Rehab 10kW DIY Grid-tied PV System - Residential, Bacoor

Basahin sa Filipino

Type
Residential
Location
Bacoor, Cavite
System size
10.45 kWp
Scope
Supply of Materials & Technical Assistance
Angled drone view of the DIY grid-tied solar array on the green metal roof in Bacoor, Cavite
The homeowner's DIY array: 19 monofacial 550W panels, 10.45 kWp in total, on the green metal roof in Bacoor, Cavite

Not every solar PV system starts with a full turnkey contract. This homeowner from Bacoor, Cavite wanted a 10 kW grid-tied solar PV system, but he was very careful with his budget. So he decided to do it himself: he bought some of the solar materials from JFL Solar and planned to install everything with the help of the workers he usually hires for jobs around his residence.

The Paperwork Challenge

Before a grid-tied system can be connected, documents have to be processed with both the local government unit (LGU) and the power company. For a homeowner doing it alone, this was the hardest part of the journey. Gathering the requirements and following up on every step took so much effort that at one point he almost gave up.

Building It Himself

He did not give up. With the help of his workers, he installed all 19 solar panels on the roof, 550W monofacial modules for a total array of 10.45 kWp, and mounted the main system himself.

When Help Was Needed

Installing the hardware is only half the job. A grid-tied solar PV system has to be wired, protected, configured and checked correctly before it can run safely together with the grid. When the system would not work as it should, the client turned to JFL Solar for technical assistance, and our team came to the rescue to make everything work. As the photos show, our team worked on the inverter and its DC and AC protection boxes, and on the meter base at the service entrance.

What This Project Shows

  • A DIY build can save money, but a grid-tied solar PV system still needs correct design, settings and safety checks.
  • The paperwork with the LGU and the power company takes time, so prepare the requirements early.
  • Buying materials from a supplier that also gives technical support pays off when something does not work as expected.
  • You do not have to do it alone: JFL Solar supports Pro-DIYers with free technical support for the products they buy from us.

The result: a 10 kW grid-tied solar PV system built largely by the homeowner himself, made to work with the help of JFL Solar.

  • Top-down drone view of the solar PV modules on the roof
    Seen from above: the panels he installed himself with the help of his own workers
  • Close drone view of the solar PV modules on the green metal roof
    Close up on the modules and their mounting on the metal roof
  • Top-down close view of the module rows on the metal roof
    The module rows from directly above
  • JFL Solar technician at the grid-tied inverter and its DC and AC protection boxes
    Our technician at work on the grid-tied inverter and its DC and AC protection boxes, getting the system to run as it should
  • JFL Solar technician fitting the cover of the meter base at the service entrance
    Fitting the cover of the meter base at the service entrance
  • JFL Solar technician working on the meter base at the service entrance
    Wiring the meter base at the service entrance, ready for the grid connection